Progress for the Richmond pool renovation and resurfacing is underway, and designs and permits have been approved. As one of our largest pools, we know how important this amenity is to many residents who use it regularly. One of the features we are excited about is a zero-entry portion that will help residents enter and exit the pool with ease.
After a year of planning and permitting, CenClub has broken ground on the Parking lot pickleball complex, bringing the total pickleball courts in the village to 18 courts.
This project is an exciting addition to the amenities here, providing our resident athletes with more time to play during the busy season.
Project Updates from July-September
Project Updates from May - June 2023
Project Updates from June 2023
Updated video from May 2023
The pavers are almost completed, and the new canopy is fully constructed. Finishing touches are being made on irrigation in preparation for new landscaping. Coping and tiling are nearly completed around the pool perimeter.
The canopy is being constructed adjacent to the pool house. Insulated panels are being installed atop of support trusses. This new structure is hurricane rated and covers more area than the previous canopy.
Pavers are starting to go in, the new canopy posts have been set in concrete footers, and the finishing touches on tile and coping are being done.
Tile and coping are installed and the area is being prepped for pavers. Three Sylvester Palms have been added to the pool deck area. Tile has been installed around the restroom walls to compliment the tile from the pool.
Hangers were installed on the plumbing, and the electrical is being done. Once the elecrical and plumbing is complete, the trench around the perimeter will be filled will base rock and packed with dirt.
The structural concrete form is hardened and braces are removed. The pool is almost ready for the waterproofing compound layers.
Teams mobilize and being applying the Gunnite structural concrete and forming the base layer of the pool.
The pressurization inspection passes and the rebar and backerboards are installed. lights and ladder locations are indicated, and the form is ready to be applied.
Piping for the new circulation system has been laid and is ready for pressure inspections. Once the inspection is completed, work can begin on the structure.
The excavation is completed and the pool is beginning to take shape. Framing begins to be set in place to prepare for more materials to assist in forming the pool.
The Richmond Pool and deck have been ripped up, and removed from the site. Teams begin to mobilize to excavate the new shape of the pool.
The pool has been completed and is open for residents to once again enjoy!
Pavers are being laid on the deck. The pool is receiving final preparations to receive the new surface once pavers are complete.
Coping and tile is being completed around the edge of the pool.
The pool has been emptied and old pavers removed. New forms are drying for the pool coping replacement. Tile has been replaced around the perimeter gutter wall. Next, the pool surface will be chipped down.
The pavers are completed, and fence posts are in. Once the posts are cured and pass inspection
While the asphalt is curing over the course of weeks, the brick pavers are being installed in the center path and courtyard area.
Base-rock is laid and compacted. The asphalt was applied and rolled out in preparation for surfacing the courts. There is a two-week waiting period for the asphalt to cure.
The outer form is poured, and shaped. Once dry, the base-rock can fill the site in preparation for paving.
The outline of the playing area is ripped up and leveled. Trenches are made to brace the perimeter The outer form for the surface is built.
The pool has been completed and is open for residents to once again enjoy!
The new pavers are nearly complete. Border and detail cuts will be made, and then the surface will be getting sand.
The old pavers are being removed in preparation for new paver sand. During this time the pool will be drained and serviced
The Berkshire pool has been completed and is once again open for residents to enjoy!
New forms we poured and sculpted for the pool coping replacement. Tile has been replaced around the perimeter gutter wall. Next, the pool surface will be chipped down.
The pool has been emptied, and tile and coping have been stripped. Preparations for resurfacing are underway.